Here Craig is drilling in the latch area; it appears that the replacement door is already in place at this stage. Also notice the gray primer on the lower side of the midline; this was from my direction that both side hatches be permanently closed off and blended with the body, with the propane tank and generator relocated elsewhere (the generator was never back there since the stretch was made anyway).
No portion of this page, text, images or code, may be copied, reproduced,
published or distributed in any medium without the expressed written permission
of the copyright holder.