We marked and cut small notches in the template that conicided with each of the 4 threaded rods that hung down from the bottom of the coach. These rods, with respective nuts, are what will eventually hold the support brackets/straps and new tank in place. These 4 notches helped line up and hold in place the template when it was pressed up against the 2 oiled drain pipes to mark their locations.
No portion of this page, text, images or code, may be copied, reproduced,
published or distributed in any medium without the expressed written permission
of the copyright holder.