All done except for some base boards and kick panels. I found some rot at each end of the step. The driver's side was really bad - can see down into the wheel well - so will have to patch before covering with the Pergo and some carpet on the risers. The carpet on the flight deck will have to wait until phase II of project.
No portion of this page, text, images or code, may be copied, reproduced,
published or distributed in any medium without the expressed written permission
of the copyright holder.