A new frame was built for the twin bed. In front of the frame there is a gutter for water and power lines. Under the bed the new Vitron charger/converter, the house battery and the fuse box will find a place. The rest will be storage.
No portion of this page, text, images or code, may be copied, reproduced,
published or distributed in any medium without the expressed written permission
of the copyright holder.